SAI INDUSTRIES

Discover Our Steel Fabrication Expertise

“With the mission to be a supreme leader in its area of expertise “Sai industries Pvt Ltd “established for itself a brand reputation in the Steel Fabrication Industry.”

yellow and black factory during daytime

We constantly seek better ways to deliver our products and capabilities and are expanding our scope and reach in response to the needs of our customers across India. Our dedication to uncompromising service and maximum delivered value has earned the trust and loyalty of all we serve.

We constantly seek better ways to deliver our products and capabilities and are expanding our scope and reach in response to the needs of our customers across India. Our dedication to uncompromising service and maximum delivered value has earned the trust and loyalty of all we serve.

We are proud that we have worked with eminent Government and Private companies like Tamil Nadu Electricity Board (TNEB), Tamil Nadu Generation and Distribution Corporation (TANGEDCO), NTPC Tamil Nadu Energy Co Ltd (NTECL),Chennai Radha Engineering Works Pvt Ltd, Techpro Systems, Tenova Takraf, Schwing Stetter India Private Limited ,Conweigh Systems Pvt Ltd, VME Precast Pvt Ltd, BGR Energy Systems Limited, Cheittinad Cement, Neyveli Lignite Corporation Limited, Eswari Excellence in Protection, JK Fenner, FL Smidth Ltd, Elecon EPC Ltd, Moss Engg Ltd Etc.

If you require more information after looking through this profile please feel free to explore our website at WWW.SAIINDUSTRIESPVT.COM to learn more about Sai industries Pvt Ltd commitment to quality, service, and value. Or contact us to discuss a specific application, challenge, or need.

 

At SAIINDUSTRIESPVT.COM, we have successfully executed numerous projects, providing high-quality steel structures that meet stringent industry standards and exceed client expectations.

Sai industries Pvt Ltd has done extensive jobs on Heavy Structural, Stainless Steel Fabrication, Piping, Onsite Steel Fabrication, Erection, Sand Blasting and Painting, Mechanical Equipment Fabrication & Erection jobs to wide range of Industries from Power, Cement, Sugar, Petroleum, Petrochemical, Metal & Several other allied industries..

Sai industries Pvt Ltd is located in Elanthanoor at North Chennai, having its manufacturing workshops, office within one roof. It has a total plant area of 2.3 Acres, with well equipped workshop, Heavy Fabrication Machineries, Skilled work force supported by an experienced and dedicated Engineers with fully computerized designs & operations to handle the engineering aspect of the Project. SAI INDUSTRIES has a total work force of around 60 peoples with the capacity to fabricate 3000+MT Per Annum.

worm view photo of buildings under cloudy sky

Save time, Save money, With Quality Products & Service – SAI INDUSTRIES Works.

 

Our Journey in Steel Fabrication

Founded over a decade ago, our company has grown from a small fabrication shop into a leading provider of industrial steel solutions, serving numerous sectors.

+
Experience

With over 15 years of experience, our team excels in delivering high-quality steel fabrication solutions for various industries.

+
Happy Clients

Our skilled workforce consists of 50 dedicated employees, ensuring every project meets our high standards of quality and craftsmanship.

 
Employees

We have successfully completed over 200 projects, showcasing our commitment to excellence and customer satisfaction.

Meet Our Experts

Our diverse team of professionals is committed to delivering innovative solutions and exceptional service.

Alexander James

Designer

Franklin Anthony

Dancer

Benjamin Michael

Business Admin

Ethan Patrick

Painter

Get in Touch for Your Steel Fabrication Needs

SAIINDUSTRIESPVT.COM specializes in high-quality steel fabrication, serving diverse industries with commitment and expertise.

QUALITY CONTROL MANUAL

SCOPE

1. Inspection and test of equipment shall be based on approved drawing and applicable procedures.

2. The quality Control Department shall responsible for the following but not be limited:

RAW MATERIAL PROCUREMENT

1.All raw material will be supplied by approved Vendor to their relevant mill/test’s certificates.

2. when material received from the mill does not satisfy the standard’s tolerance for camber, profile, flatness or sweep corrective work by the use of controlled heating, chemical and mechanical straightening, subject to the limitation of the standards, may be perform. It could be done or shall be replace with a new one and precise one.

3. Steel material for fabrication shall not be heavily pitted or rusted.

4. Production Department shall provide the following documents for record and control of material.

  1. Material List & Cutting Plan.
  2. Material Test Report/Mill Certificate(from the supplier)
  3. Delivery List.
MATERIAL RECEIVING INSPECTION

1. Upon arrival of the material at fabrication yards, Warehouse Section will inform QA-QC Department and Project Control to recheck the raw material. Scope of the inspection shall include visual dimension, sharpness, thickness, heat no. or manufacturer no., etc.

2. Identification marks of material grade shall be clearly marked on all pieces of material including those cut from stock or from the whole material itself. This identification marks shall remain clearly visible at all times. Recommended type of medium for identification marking shall be stamp, paint or crayons. Subcontractor shall propose to Contractor the method inspection.

3. Any non-conformance between Client document and material received by Purchase department .QA/QC Department will inform with Quality Assurance Confirmation (QAC)

4. When some material are unacceptable, QA/QC Department marked the material as “REJECTED”

5. Repair material shall client specification and repair procedure approved by Client

6.Inspection result shall be reported in Material Receiving Report.

MATERIAL CONTROL

1. After material received inspection has been conducted and material beenaccepted, the Warehouse Section shall store the material and issue to thefabrication section upon instruction.

2.The material received by Warehouse Section and material issue forfabrication shall be continuously reported to Project Control of status theProject’s materials.

3. The excess raw material from the fabrication section shall clearly beidentified and returned to the Warehouse Section for restore.

4. Stock material on warehouse shall be checked for visual and Dimension byquality control. Material should be store in secure place to preserve theaccuracy and quality before process fabrication

 
QUALITY CONTROL INSPECTION PROGRAMS FOR FABRICATION

All fabricated part shall be inspected to the following items:

A).IDENTIFICATION MARKS

  1. Transfer of identification marks (include heat no.) shall becheck prior to cutting.
  2. Material traceability report shall be made.

B). MARKING

  1. Giving the mark OK, if result of mark is correct.
  2. After giving mark OK, we can do the next process.

C) DIMENSION & FITUP

  1. Checking the ” MAL ” according on the place.
  2. MAL made the duplicated equipment as same as one from paper/plywood.
  3. Identity that the MAL has been made and checked in accordance to drawing approval.
  4. Only approved MAL will be used for fabrication process (marking, cutting, bending, rolling, beveling)
  5. Progressive dimensional check shall be conducted at stages before, during and after the manufacturing process.
  6. Dimensional marking shall be checked prior to cutting, beveling, bending, and rolling. After part or final assembling, all dimensional marks are to be reconfirmed for accuracy prior to further works such as reforming, etc. in which the dimensional inspection shall be conducted.
  7. All measuring Tools to be used for Measuring and Inspections shall be calibrated by an Authorized Agency. The Calibration records shall bekept as a QA records.
  8. Check with measuring tools all dimensional of individual members/shop assemblies, within the specified tolerance.
  9. Inspection result shall be reported in the from of Dimension Inspection Report

D) WELDING:

1. Prior to welding activity, welding procedure qualification test, welding specification, welding map, welder performance test and welder approved by Contractor and Company.

2. All fabricated parts shall be inspected as to the following :

  1. Visual Inspection
  2. As per WPS/PQR and welder has been full filled before welding, during welding and after welding.
  3. All welding will be visually inspected to check if that there are defects such as undercut, crack, blow hole, slag inclusion, and fused spatter.
  4. All parts shall be thoroughly cleaned. All dirt, welding electrode stubs and foreign matter shall be removed.
  5. The leg size of fillet should be in accordance with the design stipulation.
  6. Formed corner of bracket shall be visually checked, and shall be no crack or harmful defects is produced.
  7. Welding tolerance shall be accordance with Indian Standards

3. Non destructive examination (NDE) of pressure boundary Weld and attachment welds to pressure boundary shall be done in accordance with the approved NDE Procedure.

  1. When PWHT and hardness test is required, therefore Subcontractor shall maintain these activities to comply with the approved procedures.
  2. Inspection result shall be reported in the Welding Inspection Report

E) PAINTING:

  1. All surfaces prepared for painting are to be inspected and the surface preparation standard and paint used shall be reviewed and approved by Contractor prior to the start of the work
  2. Contractor shall be notified of any defects, improper material or workmanship or any conditions which affect the satisfactory performance and permanency of work
  3. No work shall proceed at any stage of the job until the following stage inspections have been carried out and approved:

Before blasting :

  1. The surface shall cleaned from dirt, dust, and other foreign matter
  2. The surface have cleaned shall be dried.

After blasting:

  1. Grades surface preparation
  2. Surface profile.

4. Improper procedures during application, even though the specified total dry film thickness has been achieved, shall be sufficient cause for complete removal of the applied material and re-application using the specified procedure.

Inspection result shall be reported in the form Coating Inspection Report.

DOCUMENTATION

QC Departments needs to maintain the following Documents with the Standard formats Of Sri Karpaga Vinayaga Engg Works as well as Client:

  1. Approved QAP for The Specific Project
  2. Material Control Chart
  3. Raw Material Test Certificates
  4. Fitup Inspection Report
  5. WPS/PQR/Welder Qualification Certificates
  6. Assembly inspection Dimension Report
  7. Painting Inspection
  8. Packing and Dispatch Instruction.